Ox is in the mire. After installing the window wells yesterday, I realized that I may have installed them too high on the 2nd house. I decided that they needed to be lowered for two reasons. One, if I left as is it would probably end up needing an escape ladder because the dept was right at or barely exceeding the 44" max. Two, it would have been way above final grade. Resetting the wells cost me two hours and an extra $40 for additional concrete anchors.