
Stripped concrete forms off 2nd house. Plumber was supposed to do in-grounds for both houses, but couldn't because they both had water to the top of the footings. I bought two sump pumps and put one in each house with a house to the street to drain them. Plumber should be back on Thursday. Goal is to pour floor on friday.
Officially closed on construction loan.
No comments:
Post a Comment