Garage poured on 2nd house. Wall framing started on first house.



My first major engineering error was discovered. I didn't account for the brick ledge in the main floor. I should have reduced the main floor footprint where the brick ledge was added. This affected the front two bedroom -- now 4" smaller. Most of the exterior walls are complete.